Concrete swimming pool built by MURES on a plot in the Axarquía with sea views
Concrete swimming pools · Axarquía · Málaga

Swimming pool construction in the Axarquía

We dig it out, build the retaining wall if your plot is on a slope, raise the concrete shell and finish the pool surround. One team, our own machinery and a fixed, itemised quote, with the ground sorted, not just the pool shell.

  • Since 2006 building across the Axarquía
  • Our own machinery and quarry used by our own crew
  • 5,0 ★ on Google
  • Free, no-obligation visit

Quick answer: MURES builds concrete swimming pools across the Axarquía (Málaga), with our own machinery for the excavation and earthworks. Free site visit and a fixed quote in writing. Call or WhatsApp us on 686 746 094 (English spoken).

Why MURES

We are builders, not pool salesmen

In the Axarquía the hard part of a pool isn't the shell, it's the ground. And the ground is exactly what we deal with every day.

Digger on a levelled terrace for a pool next to a rock retaining wall and olive trees.

Pool platform preparation:, not a photograph of a documented project.

The ground sorted

Hillside, rock or poor access: we do the earthworks and the rock or concrete retaining wall before the pool.

Yellow digger preparing a flat earth platform among olive trees.
Site preparation ahead of a swimming pool project.

One single team

Excavation, shell, plumbing, coping and pool surround with the same company. One person in charge and one timescale.

Plot marked out with stakes and string to plan a swimming pool.

Pool setting-out on an earth platform.

Itemised quote

Fixed and in writing, with every item broken down so you can make a real comparison with other quotes.

Rectangular pool with light beige stamped concrete surround and a Mediterranean garden.

Pool surround in light stamped concrete with an irregular stone pattern — Service.

Pool surround included

We finish the surroundings with light-coloured non-slip stamped concrete that doesn't burn bare feet.

Price

Swimming pool prices in the Axarquía: what they depend on

It depends on many things, which is why we don't give catalogue prices: we come and see your plot and give you a fixed quote. These are the factors that affect the price most and how much each one counts.

Reinforced concrete wall creating a level terrace for a pool on an Axarquía hillside
The ground is what affects the price most

The land

If we hit rock when digging, a hydraulic breaker is needed and the job changes a lot.

Very high impact

The slope of the plot

On a hillside you nearly always need a escollera rock wall or retaining wall to create the level terrace.

Very high impact

Size and depth

More cubic metres of excavation, concrete and lining.

High impact

Access for lorry and digger

Narrow streets or dirt tracks make excavation and concrete pouring harder.

Medium impact

Lining and finishes

Gresite mosaic, porcelain tiles or liner, built-in steps, lighting, coping.

Medium impact

Filtration and equipment

Chlorine or salt, heat pump, pool cover, automation.

Medium impact

Pool surround and landscaping

Square metres of stamped concrete, stone or porcelain tiles around the pool.

Low–medium impact

Licence and project

Depending on what each town hall asks for and the type of land your plot is on. If you need one, it can be handled by Trámita.

Low impact

What makes a pool in the Axarquía expensive isn't the shell, it's the ground. That's why we always come and look before giving a price, and we tell you whether a wall or rock excavation will be needed before we start, not halfway through the job.

Calculator

Size up your pool in 30 seconds

Move the measurements and you'll see how much water it holds, the soil to be dug out and the square metres of pool surround. It's a rough guide: we'll look at the rest on the site visit.

Water46m³ · 46.400 litres
Water surface32m² of water
Soil to excavate76m³ approx. (including over-dig)
Pool surround35m² of stamped concrete
Filling320 m³ water tankers, or about 46 hours with a hosepipe

These are rough figures, not a price. The price depends mainly on the ground, and we'll give it to you item by item after seeing the plot.

Ask for a price for this pool on WhatsApp
Complete quote

What a proper quote includes

Two quotes with a big price difference sometimes only differ in that one includes the filtration system and the other doesn't. Always ask which items are included. In ours, they are all in plain sight.

Concrete pool shell built with sprayed gunite

The build

  • Site visit, setting-out and ground survey
  • Excavation of the pool shell and removal or reuse of the soil
  • Retaining wall or rock wall if the plot needs it
  • Steel reinforcement and gunite or reinforced concrete shell
  • Inlets, returns, skimmers and main drain
  • Stone or precast coping around the edge
Pump, filter and electrical panel for a concrete pool

Equipment and finish

  • Pump, filter and electrical control panel
  • Plant room or pit for the filtration
  • Lining: gresite mosaic, porcelain tiles or reinforced liner
  • Built-in or stainless steel steps
  • LED lighting
  • Stamped concrete surround around the pool
Step by step

How we build a concrete swimming pool

From the moment the digger arrives until you fill it, it normally takes 4 to 8 weeks, depending on the size, the ground and the weather.

Plot marked out with stakes and string to plan a swimming pool.

Site visit and quote

We look at the ground, the access and the slope, and give you an itemised price.

Free
Setting out a pool with stakes and string on the plot

Project, licence and setting-out

Plans and building permit in order. We mark out the pool on the ground.

Depends on the town hall
Digger excavating a swimming pool in Vélez-Málaga

Excavation

With our own machinery. If we hit rock, a hydraulic breaker.

1 to 3 days
Ribbed steel reinforcement for a concrete pool shell

Steel reinforcement

The shell is reinforced with ribbed steel bar: floor, walls and steps.

2 to 4 days
Spraying gunite on a concrete swimming pool shell

Gunite

Concrete sprayed under pressure: a one-piece shell with no joints.

1 to 2 days + curing
Installing the filtration and pipework for a concrete pool

Plumbing and electrics

Pipework, filtration, electrics and lighting.

3 to 5 days
Pool coping finished in stamped concrete

Lining and coping

Gresite or porcelain inside, stone or precast on the edge.

1 to 2 weeks
Rectangular pool with light beige stamped concrete surround and a Mediterranean garden.

Pool surround and filling

Non-slip stamped concrete around the pool, clean-up and fill.

3 to 5 days
Week 1Excavation and reinforcement
Week 2Gunite and curing
Weeks 3–5Plumbing and lining
Week 6Pool surround and filling
Pool types

Gunite, reinforced concrete or prefabricated

All three are sound if they are done properly. We explain what each one is for and which one we would recommend.

Freeform gunite pool at a country house in the Axarquía

Gunite

The one we build most

The shell is monolithic, adapts to any shape and stands the test of time very well. It's the one we recommend in most cases.

Rectangular formwork concrete pool with a stamped concrete surround

Formwork reinforced concrete

The walls are shuttered and the concrete poured. It makes sense for large rectangular pools or when the shell also acts as a retaining wall.

Prefabricated pool set into an excavated hole

Prefabricated

Quicker and cheaper at the outset, but limited in shapes and sizes and less durable. If budget comes first, we'll tell you so clearly.

Comparison of pool types
TypeDurabilityShapesBuild timeIdeal for
Gunite●●● Very highAny, curves included4–8 weeksAlmost every case, sloping plots included
Reinforced concrete●●● Very highStraight5–9 weeksLarge pools or pools that act as a wall
Prefabricated●●● MediumCatalogue shapes2–4 weeksTight budget and flat ground
Infinity pool with sea views on an Axarquía hillside
We also build

Infinity pools with views

On a hillside with sea views, an infinity (overflow) edge makes the most of the drop: the water spills into a hidden channel and seems to merge with the horizon. It needs a perfectly level shell and a strong wall behind it, which is exactly our territory.

Our speciality

Swimming pools on sloping plots

In the Axarquía hardly anyone has a flat plot.

Building a pool on a hillside usually requires earthworks, a rock or reinforced concrete retaining wall to create the terrace and, sometimes, digging into rock or stabilising the bank with sprayed concrete.

Many pool companies leave that part out of the quote. We include it and deal with it using our own crew and machinery, and give you a price with the ground sorted, not just for the shell.

Pool on a sloping plot held up by a rock retaining wall
Swimming pool on a rock retaining wall
Reinforced concrete wall creating a level terrace for the pool
Pool terrace with a rock retaining wall in Alhaurín el Grande
Interior finish

Gresite, porcelain or liner: which to choose

The lining is what you see and touch every day. This is how each one performs.

Pool lined with blue gresite mosaic and crystal-clear water

Gresite mosaic

The classic: small glass tiles, very resistant to chlorine and salt. It gives that timeless blue and adapts to curves.

Blues and sands

Modern pool lined with large-format porcelain tiles

Porcelain tiles

Large tiles, a modern look that flows on from the terrace. Ideal for straight pools in contemporary homes.

Stone, grey and anthracite

Pool with sand-coloured reinforced liner

Reinforced liner

Reinforced PVC membrane. Guaranteed watertightness and a good price; it's replaced after a number of years.

Sand, aqua green and grey

Non-slip stamped concrete around a swimming pool
Pool with sand-coloured wood-texture stamped concrete paving.

Pool with sand-coloured wood-texture concrete paving — Service.

Pool surround in sand-coloured stamped concrete
The pool surround

Doesn't burn, doesn't slip

The surround is the part you walk on most, and the part you notice most in August.

Around the pool we recommend stamped concrete in a light colour with a non-slip finish: it doesn't burn bare feet, it grips when wet and has no joints for weeds to grow in.

The coolest colours are off-white, cream, sand and beige. Dark colours get very hot in the sun.

Paperwork

Planning permission for a swimming pool in the Axarquía

Building a pool always requires permission from the town hall. What changes is the type of procedure and what they ask for.

Urban land

Usually a building licence with a signed project or technical report. It's the quickest case to process.

Rustic land

In many country houses in the Axarquía there are more requirements, and it depends on the legal status of the property. It's best to check before designing.

Distances and plot coverage

Each municipality sets the distance from boundaries and how much of the plot the pool can take up.

Each town hall (Vélez-Málaga, Torrox, Nerja, Periana…) has its own rules. On the site visit we'll guide you on what yours usually asks for and coordinate the build with the technical project. For the paperwork, Trámita prepares the documents and handles your licence application with the town hall.

Ideas

How your pool could look

Concrete swimming pools at country houses, cortijos and villas in the Axarquía.

Concrete swimming pool with a light stamped concrete surround built by MURES
Round concrete pool with curved steps lined in gresite
Finished concrete pool at a house in Vélez-Málaga
Pool next to a white cortijo in Periana
Small concrete pool in the patio of a village house
Pool lit up at night with LED lights
5,0
★★★★★

Our clients' rating on Google

See reviews on Google

Where we build swimming pools

  • Vélez-Málaga
  • Torre del Mar
  • Trapiche
  • Viñuela
  • Periana
  • Los Romanes
  • Puente Don Manuel
  • Canillas de Aceituno
  • Canillas de Albaida
  • Cómpeta
  • Frigiliana
  • Nerja
  • Torrox
  • Algarrobo
  • Benamocarra
  • Rincón de la Victoria
  • Colmenar
  • Comares
  • Moclinejo
  • Alcaucín
  • Sayalonga
  • Sedella
  • Salares
  • Árchez
  • Arenas
  • Almáchar
  • El Borge
  • Cútar
  • Benamargosa
  • Iznate
  • Macharaviaya
  • Totalán
  • Riogordo
  • Alfarnate
  • Alfarnatejo
Free, no-obligation quote

Thinking about building a pool?

We build your bespoke concrete swimming pool, from the excavation to the stamped concrete surround. Building in the Axarquía since 2006, with our own team.

  • ✓ Free site visit
  • ✓ Fixed-price quote
  • ✓ Our own machinery

Send us on WhatsApp

  1. A few photos of the plot, ideally from several angles.
  2. The size you have in mind.
  3. The town or village.
Send photos on WhatsApp Request a quote with photos Call: +34 686 74 60 94 Free visit and no-obligation quote if you own the land or property.
Still deciding whether to buy a plot? A feasibility visit costs €100 + VAT, and if you buy and hire us for the work, we deduct it from the bill.
FAQs

What people ask us most before building a pool

How much does a concrete swimming pool cost in the Axarquía?

It depends on the size and depth, the ground (whether we hit rock when digging), the slope of the plot and whether walls are needed, access for machinery, the lining, the filtration and the extras. That's why we don't give catalogue prices: we visit the plot with no obligation and give you a fixed written quote, with every item broken down.

How much does a small swimming pool cost?

A small pool (for example 6×3 m) needs less excavation, concrete and lining, but the filtration, plumbing and fixed labour weigh proportionally more. That's why the price doesn't drop in line with the size. On small plots or patios, access for the digger is usually what matters most.

How long does it take to build a concrete pool?

From the moment the digger arrives until it's filled, it normally takes between 4 and 8 weeks. It takes longer if we hit rock, if a retaining wall has to be built first or if it rains during the gunite or lining stages. Before that you have to allow for the licence, which depends on the town hall.

Do you need a licence to build a swimming pool?

Yes. Building a pool always needs municipal permission and, normally, a project or technical report. Each Axarquía town hall has its own rules on distances to boundaries and plot coverage, and on rustic land the requirements are stricter. On the site visit we'll guide you on what your town hall usually asks for, and if you want it handled from start to finish, Trámita can process your building licence.

Which is better, a gunite or a reinforced concrete pool?

Both are very durable. Gunite is made by spraying concrete under pressure onto the steel reinforcement; it's one piece and takes any shape: it's the one we recommend in most cases. Formwork reinforced concrete makes sense for large rectangular pools or when one wall of the shell also acts as a retaining wall.

Can you build a pool on sloping ground?

Yes, and in the Axarquía it's the norm. You usually need earthworks and a rock or reinforced concrete retaining wall to create a level terrace for the pool. That's exactly what we do every day, so we give you a price with the ground sorted. On hillsides with views you can also build an infinity pool.

What happens if we hit rock when digging?

It has to be broken with a hydraulic breaker, which makes the excavation longer and that item more expensive. That's why we check the ground on the site visit and, if there are signs of rock, we tell you and put it in the quote so there are no surprises halfway through.

Which lining is best: gresite, porcelain or liner?

Gresite is the most versatile and resistant to chlorine and salt, and it adapts to curved shapes. Porcelain gives a modern, continuous finish, ideal for straight pools. Reinforced liner is the most economical and guarantees watertightness, but it has to be replaced after a number of years.

Chlorine or salt chlorination?

Salt chlorination produces chlorine from salt dissolved in the water: the water is gentler on skin and eyes and maintenance is easier. It has a higher upfront cost for the equipment. With traditional chlorine the installation is simpler and cheaper. Both work with a concrete pool.

What flooring should go around the pool?

We recommend light-coloured stamped concrete with a non-slip finish: it doesn't burn bare feet, it grips when wet and has no joints for weeds to grow in. The coolest colours are off-white, cream, sand and beige. You can see them all in our stamped concrete colour chart.

When is the best time to start building a pool?

Between autumn and winter. That way you have time for the licence and the build, and the pool is ready before summer. In spring demand rises sharply and lead times get longer.

Fixed price, no obligation

Got a plot or a project in mind?

Send us a few photos on WhatsApp. We'll come and see it and give you a fixed written price.